The building decides before a single cable is run
For new cabling, the building fabric matters first: in a new build with prepared conduits, a run takes minutes; in an older building with solid walls, the same run needs chasing, breaches, and often coordination with fire protection.
The number of floors and sockets matters too, not in a straight line but through the paths between them: ten sockets on one floor are easy to plan, ten sockets spread across three floors with few existing risers mean far more effort per socket.
- Building age and existing cable routes
- Number of network sockets and floors
- Fire compartments and required breaches
- Copper or fibre between buildings